Industries
Transformers, turbines and substation equipment with permits, escorts and installation readiness.
Energy projects live by the outage calendar. Equipment arriving a week late often means postponing commissioning to the next season, which is why we plan these movements 8–12 weeks ahead and fix alternative routings.
Engineered transport of complete production lines, power equipment and out-of-gauge units.
A transport engineering solution, not just a vehicle for the load
Project cargoLow-bed trailers, modular platforms, permits and escorts for cargo beyond standard dimensions.
Permits and escorts arranged before the vehicle is dispatched
Out-of-gauge transportCombined sea + rail + road schemes under a single contract and a single tracking number.
One party liable for the whole chain, not for a single leg
Multimodal logisticsPower grid operator
Moving a transformer from Italy to a Romanian substation: a sea leg, a modular platform and temporary removal of overhead lines.
weight of a single piece
peak shock load recorded
From five working days for domestic routings up to twenty-one days for multi-country movements. It depends on whether bridge approvals are required and how many road authorities the route crosses. We start the process immediately after the engineering survey.
Contacts
A logistics engineer prepares the route, the transit time and the cost structure within one business day.
Next step
A logistics engineer prepares the route, the transit time and the cost structure within one business day.
Average first response — 41 minutes