Contract logistics
Contract storage, cross-docking, order fulfilment and bonded warehouses in eight countries.
A warehouse is not a place where goods stand still; it is a cash-flow control point. A bonded regime defers import duty and VAT until the actual sale, and cross-docking removes storage from the chain altogether.
48 000 м²of warehouse space under management
48,000 m² under management with WMS and barcode control
Bonded sections: duty is paid at release, not at arrival
Cross-docking within six hours without putaway
Stock counts on request and live inventory visibility
Quantity, condition and labelling checks with photo records of discrepancies.
A WMS location is assigned according to the storage conditions.
Picking, repacking, labelling and shipment building.
Handover to the carrier with documents and a photo report.
Goods are stored under customs control and duty and VAT become payable only when a batch is released for free circulation. You can import a full container and pay in instalments as you sell. The maximum storage period is 1,095 days.
DIY hypermarket chain
More than 60 trips a month from four EU countries into three distribution centres, with slot booking and zero penalties for a quarter.
deliveries inside the window
in penalties for the quarter
Pharmaceutical distributor, Poland
Monthly deliveries of temperature-sensitive medicines from India to Warsaw with a complete temperature archive and zero excursions over fourteen months.
temperature excursions
consecutive compliant deliveries
Licensed brokers, tariff classification, T1 transit procedures and protection against reassessment.
The right tariff code and a complete file before the cargo arrives
Customs brokerageA cold chain from +25 to −25 °C with continuous temperature logging and validated packaging.
A documented temperature profile for the entire route
Temperature-controlled transportGet a quote
Fill in the short form — the estimate arrives by email together with a route scheme.
Next step
A logistics engineer prepares the route, the transit time and the cost structure within one business day.
Average first response — 41 minutes