Preparation
The survey that changed the routing
The original routing passed through a small town with a weight-restricted bridge. The survey showed the low-bed carrying the heaviest assembly would not pass. We shifted the route by 61 km and added one night leg — cheaper than approving a temporary bridge reinforcement.